Project Details

Our client, a well established London based production company, has worked for AGCO for over 15 years. They were approached to organise the 50th Birthday celebrations for Massey Ferguson in France at the factory in Beauvais and formal presentations at Château La Fontaine.

Producer John Landon said “I have worked with Piccadilly AV for the past 20 years liaising with MD Mike Newton and Project Manager Eric Taylor. They have looked after all the technical specifications for our live events and become an essential part of our team. This event involved widescreen projection for the formal presentations, together with a stage set designed by our team and built by Piccadilly AV. Also involved were a product reveal at the factory, together with a large outdoor exhibition area with custom graphics panels constructed on site to suit the layout”.

Project Manager Eric Taylor said “This was a tough assignment, as the end client brief changed even while we were on site”.

Equipment

  • Logic Systems Line Array
  • 100V Line Outdoor PA system
  • Sennheiser radio microphones
  • MP3 players
  • Audio processing racks
  • Crew communications wired & wireless
  • 60", 50" and 42" Plasma screens
  • DVD players
  • Laptop & desktop computers
  • Computer networking
  • Barco RLM G6 Projectors
  • Dataton Watchout widescreen system
  • Media servers
  • Martin & Robe Intelligent Lighting
  • LED Flood and Wash lighting
  • LED Battens
  • Generic lanterns
  • Control by Avolites and Zero 88
  • Truss & Rigging
  • Mains distribution throughout exhibition areas
  • Mains distribution to presentation areas
  • Mains distribution to all lighting systems
  • Custom made stage sets
  • 50m wide x 8m high reveal drape
  • Erection of security fencing with custom coloured netting
  • Installation of coloured panels to existing fencing
  • Installation of 225 graphic panels onto frames built and installed on site
  • 12 Crew 10 days Rig & Derig
  • 6 Technical Crew "" show days
  • 1 Artic
  • 2 7.5 T trucks
  • Crew bus